Accelerating the
Philippines' Transition
to Renewable Energy

Zero capital outlay. Guaranteed savings. Solar energy on your terms via our BOOT/PPA model — designed for Philippine enterprises.

4 PROJECTS
C&I SCALE PROJECTS
40 MW
PEAK SOLAR CAPACITY
150 KW
GROUND-MOUNT POWER
Our Services

Our Services

Trusted by industry leaders
Why Berde Renewables

The Berde Advantage

  • Strong track record of successful projects.
  • Streamlined project implementation.
  • Experienced team with 30+ years of cumulative experience.
  • Financially backed by I Squared Capital.
  • 100% project completion guarantee.
Berde Renewables solar installation
Impact at Scale

Real Numbers.
Real Results.

Our track record across the Philippines speaks for itself.

Solar Impact Dashboard
0kWh
Clean Energy Generated
0
Tonnes CO₂ Avoided
0+
Active Projects
Client Success
"Delivered in a timely manner... their commitment to excellence is unparalleled."
PZ
Patrick Zhu President, Berde Renewables
Technical Specifications
System Architecture
Grid-tied & Hybrid BESS Ready
Module Tech
Tier 1 Monocrystalline PERC
Lifecycle Warranty
Up to 25 Years (PPA)
Monitoring
24/7 AI-Driven Telemetry
Berde Renewables engineers at a solar installation site
How It Works

The BOOT Model —
Built Around You

At Berde Renewables, we are committed to helping our clients transition to a cleaner, more sustainable energy future. We provide all services and solutions designed to provide you with absolute solutions that meet your energy needs and goals.

01
Build
We design, finance, and build your solar energy system — at absolutely zero capital cost to your business.
02
Own
Berde owns and insures the system throughout the contract period, removing asset risk from your books entirely.
03
Operate
Our expert technicians monitor, maintain, and optimize your solar array 24/7 — maximizing uptime and energy yield.
04
Transfer
At the end of the contract term (10–25 years), full system ownership is transferred to you at no additional cost.
₱0 Capital Required — Start Saving Immediately
Our Clients

Trusted by Philippine Industry Leaders

From manufacturing to retail, agriculture to government — we power the businesses that power the Philippines.

JOIN OUR TEAM

Build Your Career with Us

Be part of a team that is dedicated to building a cleaner, more sustainable future for the Philippines. Join Berde Renewables today!

Open Positions

View All Careers →

PROJECT ENGINEER

/0.1
Manila Full-Time

Lead the technical design and commissioning of major C&I solar installations across the archipelago.

SOLAR TECHNICIAN

/0.2
Luzon Region Field Ops

Ensure 24/7 uptime for our solar arrays through world-class monitoring and proactive maintenance.

BUSINESS DEVELOPMENT

/0.3
BGC / Remote Full-Time

Accelerate the energy transition by identifying and securing new renewable partnerships.

Ready to Make an Impact?

Join our team and help us build a cleaner, more sustainable future for the Philippines.

VIEW OPPORTUNITIES →
Our Projects

Proven Impact Nationwide

View All Projects →
CCLEX Solar Farm installation
PPA Luzon
Holcim Philippines — Rooftop Solar
1.2 MW · Laguna · Grid-tied · Operational
Berde Renewables ground-mount solar installation
PPA Visayas
Biotech Farms & KCC Malls — Solar PPA
8.4 MW · Mindanao · Sustainable Agriculture
Berde Renewables aerial solar farm photo
EPC Mindanao
Northern Samar — Government Solar Partnership
5.0 MW · Samar · Off-grid + Grid-tied Hybrid
What Our Clients Say
"Delivered in a timely manner, very professional. We've been a partner of Berde Renewables since 2022. As one of the leaders in the solar energy sector delivering stable growth, their commitment to client satisfaction and excellence is unparalleled."
Patrick Zhu
President & Co-Founder, Berde Renewables
0 MW
Portfolio Target by 2028
0%
Project Completion Rate
0 yrs
Maximum PPA Term
0–25%
Average Energy Bill Savings
Latest News

Our Latest News

View All News →
Berde Renewables leadership
October 7, 2025 Event

Berde Renewables Eyes 500-MW Portfolio by 2028

Renewable ENERGY solutions provider Berde Renewables, Inc. is aiming to deliver at least 500 MW of solar capacity by 2028 as it doubles down on Southeast Asian expansion.

Read More →
Industry award ceremony
October 1, 2025 Award

Berde Renewables Doubles Down on Growth, Clinches Four Industry Awards in Solar Quarter PH 2025

Berde Renewables cements its status as a powerhouse in the clean energy sector, delivering stable growth in the first half of 2025.

Read More →
Solar panel installation in Mindanao
August 28, 2025 Partnership

Berde Renewables, Biotech Farms, and KCC Malls Sign Landmark 8.4 MW Solar Power Agreement

The deal aims to advance sustainable retail and agriculture in Mindanao through on-site solar generation and net metering arrangements.

Read More →
Start Today

Reach Your Sustainability, Energy,
and Profitability Goals

We offer free layout and consultation. No obligations, no upfront costs. Let our experts show you exactly how much you can save.

Get in Touch

Contact Us

📍
Office Address
Unit 1702–1703, 17th Floor
Robinsons-Equitable Tower
ADB Ave. cor. P. Poveda Rd
Ortigas Center, Pasig, 1605 Manila
📞
Telephone
+63 2 531 6490
✉️
Email
info@berderenewables.com
Contact Form